Intertech Solutions to Commence Multi-Ton Bulk Sampling Program at WPE Project, Arizona
SCOTTSDALE, Ariz., Aug. 22, 2014 /PRNewswire/ -- Intertech Solutions Inc. (OTCPK: ITEC) ("Intertech Solutions Inc.," "ITEC" or the "Company") today is very pleased to report that the Company has commenced preparations to undertake a large, multi-ton bulk sampling program scheduled to occur on or before September 15th. The bulk sampling program is in keeping with the recommendations of the project technical report, as well as paralleling the ongoing metallurgical studies which are analyzing the WPE gold ore, and characterizing its nature.
The bulk samples will be processed and compared to the first 1,000 lb. (one half ton) test which yielded an overall grade of 5.733 grams per ton (0.170 ounces per ton). The larger bulk samples of the gold ore will provide a more accurate grade analysis as we progress towards a full production scenario.
Currently, we are expecting an overall grade to fall somewhere between our Phase 2 program results of 4.556 grams per ton (0.135 opt) cut to one ounce, and 9.974 grams per ton (0.296 opt) uncut. The Company remains confident that the expected overall final grade of the deposit will fall somewhere in this range and that a minimum 5 gram per ton deposit is present.
Additionally, we have received very favorable reports from the second metallurgical test, being undertaken by a Denver based testing facility. The gold characterization study of tabled gold concentrates has shown that the WPE Project gold is nearly all free gold, or free milling - not intergrown or associated with any sulphides or silicates. This means that our milling will be very simple and that the gold will be easily recovered from simple gravity separation. This will be very cost effective not requiring any complex separation techniques often required on many gold ores.
As reported earlier, based on the inferred mineral resource calculated under classification of N.I. 43-101 of 2,437,500 tons, this represents 414,375 inferred ounces. Intertech is projecting, based on 500 ton per day operating tonnage, that 2,550 ounces a month may be produced at a value of $220 per ton costing $30 per ton to produce or $190 per ton net profit. If this is achieved, a monthly net profit of $2,700,000 is possible.
We expect further results from the ongoing studies and will announce the results as soon as they are available.
The WPE Claims #1-#4 claims are located in the Middlecamp Mining District in La Paz County, near Quartzite Arizona. The gold claims cover a total of 80 contiguous acres and have easy access between Phoenix and Palm Springs, CA along Interstate 10.
About Intertech Solutions Inc. (OTCPK: ITEC)
Intertech Solutions is a fully integrated, gold project finance, management and services consulting Company that provides development capital, engineering, project supervision and technical management to gold projects. The Company operates from its offices in Scottsdale, Arizona. Visit us at: www.itecgold.com.
Notice Regarding Forward-Looking Statements
This news release contains "forward-looking statements" as that term is defined in Section 27A of the United States Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future. Such forward-looking statements include, among other things, scope and type of consulting services provided by ITEC, use of proceeds, future acquisitions, success of projects, growth and strategic plans. Actual results could differ from those projected in any forward-looking statements due to numerous factors. Such factors include, among others, the inherent uncertainties associated with petroleum exploration and development stage exploration companies. These forward-looking statements are made as of the date of this news release, and we assume no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although we believe that the beliefs, plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that such beliefs, plans, expectations or intentions will prove to be accurate. Investors should consult all of the information set forth herein and should also refer to the risk factors disclosure outlined in our annual report on Form 10-K for the most recent fiscal year, our quarterly reports on Form 10-Q and other periodic reports filed from time-to-time with the Securities and Exchange Commission.
ON BEHALF OF THE BOARD
Intertech Solutions Inc.
Robert McIntosh
President, C.E.O.
To find out more about Intertech Solutions Inc. (OTCPK: ITEC), visit our website at www.itecgold.com.
Investor Relations:
+1-480-296-2065
[email protected]
SOURCE Intertech Solutions Inc.
WANT YOUR COMPANY'S NEWS FEATURED ON PRNEWSWIRE.COM?
Newsrooms &
Influencers
Digital Media
Outlets
Journalists
Opted In
Share this article