Oldcastle's Pre-Fabricated Bathrooms Help LA Live Marriott Open 2 Months Early
LOS ANGELES, July 28, 2014 /PRNewswire/ -- SODO Builders LA, general contractor for the new $168 million LA Marriott Hotel in California, selected Oldcastle Modular to factory build 393 prefabricated Eggrock bathroom pods for the new dual-brand hotel, that includes 175 Courtyard by Marriott rooms and 218 Marriott Residence Inn rooms.
By using prefabricated bathroom pods, the building team was able to compress the project's original construction schedule by more than two months. The LA Marriott prefabricated bathrooms were assembled in a local manufacturing facility, shipped to the site, and slid into the super structure from the side, prior to erection of the facade.
"The use of bathroom pods was a great way to solve problems with the punch list work. The use of pods resulted in an extremely streamlined punch list and faster vertical process through the building," stated Steve Foley, Senior Superintendent, SODO Builders. "As a commercial contractor, we report a time savings of 9+ weeks by incorporating bathrooms by Eggrock. I see more of the hotel construction industry becoming off-site fabrication."
Oldcastle Modular's advanced technique combines the latest design and manufacturing technologies within a controlled environment to fabricate, high quality bathrooms for multi-unit construction projects. The result is a superior, simplified, faster, and safer project, with no bathroom punch list to manage on-site.
"We built the 393 bathroom pods in our new Madera, CA facility and delivered them fully outfitted, using the approved specifications and products, to the site." stated Bill Seery, Director of Sales-Oldcastle Modular.
"An unexpected benefit of using pods was that the flow of the job went faster and smoother. We move to the next floor level much quicker and fewer RFI's were written." said Dan Medeiros – Designer/Detailer, Pan Pacific Mechanical. Definitely a time savings benefit."
stated Steve Foley.
The new Marriott, owned by American Life, scheduled to open July 2014, opened two months ahead of schedule and is seeking to attain a minimum of LEED Silver by the (USGBC).
SODO Builders LA, LLC, 100% owned by American Life, was the General Contractor, GBD Architects was the Architect of Record and Pan Pacific Mechanical were the mechanical contractors.
Oldcastle Precast is a leading provider of engineered product solutions nationwide to a number of market sectors including:
Buildings – Communications – Government/Military
Power/Energy - Transportation – Water
SOURCE Oldcastle Precast
WANT YOUR COMPANY'S NEWS FEATURED ON PRNEWSWIRE.COM?
Newsrooms &
Influencers
Digital Media
Outlets
Journalists
Opted In
Share this article