Jacobs Announces Groundbreaking for NDOT I-15 South Design-Build Project
PASADENA, Calif., March 2 /PRNewswire-FirstCall/ -- Jacobs Engineering Group Inc. (NYSE: JEC) announced today that construction has officially started on the Interstate15 (I-15) South Design-Build Project for the Nevada Department of Transportation (NDOT).
Jacobs serves as the design manager for Las Vegas Paving Corporation, the local contractor for the project. This project includes widening the freeway, the addition of collector-distributor roads, five redesigned interchanges, 26 new bridge sections and 35 retaining walls. Additionally, 1.5 miles of sound walls will be built along six miles of I-15, from Tropicana Avenue to Silverado Ranch Boulevard in Clark County, Nev.
A groundbreaking ceremony held on February 17 marked the official start of construction on the $246.5 million project.
In making the announcement, Jacobs Group Vice President Robert M. Clement stated, "We are excited that construction is underway on this important project. We are pleased to be working with Las Vegas Paving on this program, which continues our long-term relationship with NDOT."
Jacobs is one of the world's largest and most diverse providers of technical, professional, and construction services.
Any statements made in this release that are not based on historical fact are forward-looking statements. Although such statements are based on management's current estimates and expectations, and currently available competitive, financial, and economic data, forward-looking statements are inherently uncertain. We, therefore, caution the reader that there are a variety of factors that could cause business conditions and results to differ materially from what is contained in our forward-looking statements. For a description of some of the factors which may occur that could cause actual results to differ from our forward-looking statements please refer to our 2009 Form 10-K, and in particular the discussions contained under Items 1 - Business, 1A - Risk Factors, 3 - Legal Proceedings, and 7 - Management's Discussion and Analysis of Financial Condition and Results of Operations. We also caution the readers of this release that we do not undertake to update any forward-looking statements made herein.
For additional information contact: |
|
Michelle Jones |
|
626.578.6968 |
|
(Logo: http://www.newscom.com/cgi-bin/prnh/20090109/JACOBSEGLOGO)
SOURCE Jacobs Engineering Group Inc.
WANT YOUR COMPANY'S NEWS FEATURED ON PRNEWSWIRE.COM?
Newsrooms &
Influencers
Digital Media
Outlets
Journalists
Opted In
Share this article